2. After the full-dry of pillar of the Pagora Pavilion which is completed to process router plane, crack scratching and router.
1. Before construction, you assemble in real size roof materials of the hexagonal pavilion which was firstly manufactured in the plant; after checking the trimming or functions, the product is supposed to be delivered in a semi-product form on the spot to be installed.
3. Manufacturing (STS) legs of the flat bench
4. Setout of back chair after being assembled.
5. Finished view of STS grass protection tool
6. Combined pillar with tie of squared Pagora (Shingle roof)
![]() |
| ||||||||||||||||||||||||||||
7. Installing the tie of squared Pagora (Shingle roof)
8. Working constructing the eaves of hexagonal pavilion
9. Operation of Iron Rod Construction after the 1st Molding Operation
10. The 2nd Molding Operation after Iron Rod Construction
11. Operation of Stucco Primer Application
12. The 2nd Stucco Plastering Operation after the Primer Application
13. Decorating Operation after the Stucco Plastering Operation